• Dolna Odra Power Plant

    Dolna Odra Power Plant

    The requirements of Ministry of Environment Regulation, EU demand that the discharge pollutants from industrial processes and operations must be controlled and regularly monitored. Scanclimber SC500K Industrial Hoist was selected for the installation at chimney of the plant. SC500K successfully serves for periodic maintenance of chimney and to access the equipment installed on the chimney in order to monitor emissions.

    Read more
  • Neurath Power Plant, Germany

    Neurath Power Plant, Germany

    Two cooling towers were needed to be erected at Neurath Power Plant in Grevenbroich, Germany. A suitable solution was required to transport both material and passengers from ground to the landing location in construction phase. The main challenge was to adapt hoist to constantly changing gradient of the cooling tower having concave profile. Scanclimber solved the problem together with their client by developing an adaptation of the SCANCLIMBER SC2032F hoist to meet these very special requirements

    Read more
  • World’s Cleanest & Most Efficient Power Plant

    World’s Cleanest & Most Efficient Power Plant

    The coal power plant in Rustersieler Groden in Wilhelmshaven is a newly constructed power plant by GDF Suez which started its operations in full capacity in March, 2014. To ensure environment friendly emissions, it was essential to continuously monitor the emissions from the chimney which required access to the emission release point inside the chimney. Scanclimber SC400K Industrial Hoist was chosen for installation inside the chimney.

      Read more
  • 1
  • 2
  • 3

APM Terminal Maasvlakte-II Rotterdam in the Netherlands

Cargotec, one of world's largest cargo flow specialist, entered into an agreement with APM Terminals to supply eight Kalmar super quay (ship-to-shore) cranes and two Kalmar barge quay cranes in the Rotterdam Maasvlakte II expansion project. The expansion of the port of Rotterdam, Maasvlakte II, was Europe's largest land reclamation project.

The Project

APM Terminals selected Cargotec as the quay crane supplier for the company’s future Maasvlakte II terminal in Rotterdam. The decision reflects a comprehensive bidding process designed to find cranes that offer the highest safety, productivity and automation standards required for the largest container ships in the world.

rotterdam maasvlakte 02

Cargotec was to supply eight Kalmar super quay cranes and two Kalmar barge quay cranes to the APM Terminals Maasvlakte II expansion project between December 2013 and December 2014. Cargotec’s Kalmar Monobox-type, Super Post Panamax quay cranes have an outreach of 25 containers with Bromma spreaders. The cranes are semi-automated and are capable of handling 2 x 40 foot or 2 x 20 foot containers using one lift (twin-lift and tandem-lift capability) and are equipped with various additional features including second trolley and remote control, which when combined, are expected to lead to significant improvements in container handling productivity and safety. The two barge quay cranes will have an outreach of 36 meters.

Requirement for the Hoist

Cargotec's Kalmar Monobox-type quay cranes operate in the new terminal area. The huge cranes were equipped with Scanclimber SC400K permanent hoists to transport operators and service personnel. Cargotec ordered ten SC400K type permanent hoists from Scanclimber, each with a capacity of 400 kg, or about 4 people.

kalmar barge quay

The lifts use a reliable rack and pinion system and are equipped with a frequency control system to provide a smooth start and to gain a climbing speed of 36 m/min. Each hoist was to be shipped with an automatic lubrication system to maintain a smooth drive and to reduce the amount of wear and tear. For safety reasons there were two special lowering systems; one makes it possible to lower the hoist from inside the cage in case of power failure and the other system makes it possible to lower the cage safely with a controlled speed if the safety device is malfunctioning. As the terminal is by the sea it must remain operational even in very windy weather, the cranes and hoists are designed to operate in circumstances for when the wind speed is up to 100 km/hour.

rotterdam maasvlakte 01

Special Features

Two of the hoists are installed outside the quay cranes with a height of 35 meters and have 4 landing levels, eight lifts are installed inside the 4 crane legs of the higher super quay cranes. Each of these eight hoists have a lifting height of 64 meters above the quay level, starting at a height of 9 meters inside the leg structure.

kalmar quay sc400k inside

Scanclimber had to offer a cage that was large enough to fit the available space, since the leg structure/dimensions were pre-set set by Cargotec’s designers. The solution was a cage with floor dimensions of 1200x800 mm and a mast anchored to the leg structure with special shortened anchoring. There are entrances with doors in six places which provide access from the hoist to different levels of the crane.

kalmar quay sc400k outside