• Dolna Odra Power Plant

    Dolna Odra Power Plant

    The requirements of Ministry of Environment Regulation, EU demand that the discharge pollutants from industrial processes and operations must be controlled and regularly monitored. Scanclimber SC500K Industrial Hoist was selected for the installation at chimney of the plant. SC500K successfully serves for periodic maintenance of chimney and to access the equipment installed on the chimney in order to monitor emissions.

    Read more
  • Neurath Power Plant, Germany

    Neurath Power Plant, Germany

    Two cooling towers were needed to be erected at Neurath Power Plant in Grevenbroich, Germany. A suitable solution was required to transport both material and passengers from ground to the landing location in construction phase. The main challenge was to adapt hoist to constantly changing gradient of the cooling tower having concave profile. Scanclimber solved the problem together with their client by developing an adaptation of the SCANCLIMBER SC2032F hoist to meet these very special requirements

    Read more
  • World’s Cleanest & Most Efficient Power Plant

    World’s Cleanest & Most Efficient Power Plant

    The coal power plant in Rustersieler Groden in Wilhelmshaven is a newly constructed power plant by GDF Suez which started its operations in full capacity in March, 2014. To ensure environment friendly emissions, it was essential to continuously monitor the emissions from the chimney which required access to the emission release point inside the chimney. Scanclimber SC400K Industrial Hoist was chosen for installation inside the chimney.

      Read more
  • 1
  • 2
  • 3

Scanclimber playing a part in the world’s cleanest & most efficient power plant

The coal power plant in Wilhelmshaven, constructed by GDF Suez, started its operations in full capacity in March 2014. This power plant achieves a net output of 731 megawatts and has the capacity to produce up to 5.5 billion kilowatt hours of electricity per year. One of this plant's unique features is that it is highly advanced and one of the cleanest and most efficient power plants in the world, as its emissions are harmless to the environment.

There already was an operational power plant owned by E.ON near the location of this new plant. The plan was to design a new highly efficient plant in order to reduce waste. The extension of the existing power plant was planned in 2008. The coal power plant started its trial operations in December 2012.

Special Features about the Project

  • The emissions from the plant are eco-friendly. It was essential to constantly monitor emissions from the chimney in order to ensure their eco-friendliness. This required access to the emission release point within the chimney.
  • The chimney’s vertical structure was built so that its angle changes. Flexible anchoring was chosen due to this structure, the mast was adapted to the bending chimney and the case was mounted in an inclined position.
  • Scanclimber's SC400K was chosen for the installation within the chimney. A drive with the velocity of 45m/min was chosen from Scanclimber's components in order to guarantee rapid transport. Scanclimber supplied and installed three-sided landing walls on each upper landing securing the hoist’s carriage up to 250 meters of height.
gdf suez kraftwerk chimney outside

Beroa Germany, a well-known client, got the responsibility of constructing the chimney and providing the hoist service for this plant.

gdf suez kraftwerk chimney inside
 

Scanclimber Industrial products