• Dolna Odra Power Plant

    Dolna Odra Power Plant

    The requirements of Ministry of Environment Regulation, EU demand that the discharge pollutants from industrial processes and operations must be controlled and regularly monitored. Scanclimber SC500K Industrial Hoist was selected for the installation at chimney of the plant. SC500K successfully serves for periodic maintenance of chimney and to access the equipment installed on the chimney in order to monitor emissions.

    Read more
  • Neurath Power Plant, Germany

    Neurath Power Plant, Germany

    Two cooling towers were needed to be erected at Neurath Power Plant in Grevenbroich, Germany. A suitable solution was required to transport both material and passengers from ground to the landing location in construction phase. The main challenge was to adapt hoist to constantly changing gradient of the cooling tower having concave profile. Scanclimber solved the problem together with their client by developing an adaptation of the SCANCLIMBER SC2032F hoist to meet these very special requirements

    Read more
  • World’s Cleanest & Most Efficient Power Plant

    World’s Cleanest & Most Efficient Power Plant

    The coal power plant in Rustersieler Groden in Wilhelmshaven is a newly constructed power plant by GDF Suez which started its operations in full capacity in March, 2014. To ensure environment friendly emissions, it was essential to continuously monitor the emissions from the chimney which required access to the emission release point inside the chimney. Scanclimber SC400K Industrial Hoist was chosen for installation inside the chimney.

      Read more
  • 1
  • 2
  • 3

Scanclimber hoist serving in the emission control of a Polish power plant

The Electrownia Dolna Odra power plant was built in the 1970s. The plant's operation started in 1974 and it was completely operational in 1977. The power plant contains six blocks with the total production capacity of 1362 MW of electricity and 100.81 MW of thermal energy. It is a conventional power plant with blocks of open cooling systems. The plant went through a comprehensive modernization program in the 1990s for its primary energy devices.

Requirement for Scanclimber's hoist

The requirements set by the European Union's Ministry of Environment regulations demanded that the discharged pollutants from industrial processes and operations must be controlled and monitored. There was a need to regularly monitor the plant's emissions in order to follow these guidelines. For this purpose, Scanclimber's hoists seemed to be the most feasible solution for the authorities due to their modular design and adaptability.

Scanclimber's SC500K hoist was selected for the plant's chimney. The hoist was mounted outside of the 200 meter tall chimney. The hoist, however, is only lifted up to a height of 120 meters. The SC500K successfully serves periodic maintenance work for the chimney and accesses the equipment installed within the chimney in order to monitor the plant's emissions. The hoist has been used several times a month.

dolna odra power plant sc500k mounted on the chimney