• New Centum SC10000

    The SC10000 is the most powerful addition to Scanclimber’s mast climbing work platforms. Launched on the occasion of Finland’s 100th Independence Day, the machine is named ‘Centum’. The rack and pinion driven Centum is probably the strongest mast climber in the market of vertical access solutions.
    Read more
  • Huge payload capacity

    This new member of the Scanclimber family is a perfect platform for heavy duty facade work like brick laying, facade and window element installation for especially high rise construction projects. Having a huge payload capacity is a crucial differentiating factor for the Centum with respect to heavy duty operations at bigger heights without compromising on the work ergonomics.
     
    Read more
  • Vertical access solution

     
    When it comes to mast climbing work platforms with the highest payloads without compromising on the quality and safety parameters, Scanclimber is a world leader of transport platform solutions. In the last decade, the firm has come a long way in developing heavy duty work platforms and the Centum will be the greatest release so far.
    Read more
  • Improves productivity

    The Centum comes with the usual refinements and is compatible with all the prior Scanclimber MCWP add-ons and extensions. Depending on the load capacity and platform length, the Centum can have a single or a twin mast arrangement.
    Read more

Hyvinkää hospital expansion project used mast climbers

Vakka-Suomen Rappauspalvelu fastened the thick insulation elements and several layers of net to the walls with the help of mast climbers. Facade plastering and colouring was made by using mast climbers too. A total of 15 mast climbers were used for the whole process.

  • 1
HUS - The Hospital District of Helsinki and Uusimaa invested 63 million euros in a major Hyvinkää hospital expansion project. 15 mast climbers helped to complete the building’s plastering work.
Care home developer Tyvene is building a sheltered housing complex in Hyvinkää. Although it is only a two-storey building with a maximum height of 12 metres, mast climbers were used for bricklaying in this project.
A demanding mast climber solution was required on the 150-meter-tall zig-zag form buildings in Kuala Lumpur. Sliding decks of almost four meters made façade works possible.
Villa Engelin Monaco was a challenge for the constructor. It meant building a mixed-use complex in challenging circumstances within a very tight schedule on the Boulevard Exotique, Monaco.
The facades of tallest Dallas residential building, the 30-story Katy Station, finished with the help of heavy duty mast climbers in Texas, USA.
The luxury 10-storey One Thousand Ocean condominium is undergoing an extensive restoration project with the help of Scanclimber mast climbers in Boca Raton, Florida, USA.
Maxus SC5000 mast climbing work platforms were used on the Dallas High School historical building for façade restoration work. Building went through a transformation that brought life back into this piece of history which stands adjacent to the DART Pearl Street rail station in Dallas, US.
National Concrete Preservation Inc. conducted full concrete restoration work at Atlantic Ocean beach front in Hollywood, Florida with Scanclimber Maxus mast climbing work platforms supplied by Sunbelt Rentals.
Page 1 of 3

Login for registered users only

  • Feel free to leave us a message if you have any requests, questions or feedback and we'll get back to you as soon as possible.
    Add bold text
    captcharefresh

    Powered by ChronoForms - ChronoEngine.com

Mail
Contact