In 2017, Deutsche Telekom vacated a high-rise building in Bielefeld, Germany. Subsequently, the idea was to convert it into a residential student building. The centrally located facility has 18 floors and stands 76m tall or 95.5m when including the building's telecommunications tower. The Goldbeck Nord GmbH construction company used Scanclimber by Tractel's SC8000 twin unit mast climber with a full-length capacity of 46.2m for the facade renovation work.