Façade works of award-winning Grand Tower of Frankfurt were started 2016 by German company, Riva. George Kutchus, the worksite manager at Riva, gives an insight into the challenges of the project. And explains Scanclimber’s role overcoming these challenges.
You may also like
SC1837FL Construction Hoist
SC1837FL double cage construction hoist with a cage length of 3,7 meters equipped with a 3,5 wide side door. This passenger and material hoist was used at a construction site of the tallest residential building in Finland with a height of 86 meters (282 feet).
Scanclimber SC1432
Scanclimber SC1432 personnel and material hoist used at a construction site, together with another SC1432 unit and a mast climbing work platform.
Scanclimber SC1000
SC1000 mast climbing work platform - easy assembly and transportation by towable trailer chassis.
Scanclimber SC8000
Scanclimber SC8000 mast climbing work platform - a practical solution for heavy-duty works at minimal cost.