Max Sweeney from National Concrete Preservation Inc, was the project foreman at work site for renovation of Quadomain condominiums, apartment buildings in Hollywood Florida. He explains why they used several Scanclimber SC5000 mast climbers at the work site. He describes his experience of using Scanclimber mast climbing work platforms and compares the use of mast climbing work platforms with the traditional ‘swing stage’ method.
You may also like
Grand Tower, Frankfurt. PHASE II
Presenting the latest updates on the Grand Tower Project in Frankfurt. This is by far the biggest project for Scanclimber in terms of sheer amount of customized; fixed and dynamic extensions used.
George Kutchus of Riva gives his insight on the Grand Tower Project
Façade works of award-winning Grand Tower of Frankfurt were started 2016 by German company, Riva. George Kutchus, the worksite manager at Riva, gives an insight into the challenges of the project. And explains Scanclimber’s role overcoming these challenges.
Bricklaying using Scanclimber’s strongest SC10000 mast climber
Muuraus Nahkala used the Centum SC10000 mast climbing work platform for bricklaying work at the KOAS Harju student housing construction project.
Construction of the Finland’s first skyscraper used Wega H65 Twin cage Hoist
A mid-speed Scanclimber Wega SC2537-65H construction hoist used at the worksite of Majakka to transport personnel, tools and material between the 35 floors.
Wega H65 hoists used for material and labor transportation in Aviapolis, Finland
Aviapolis is an international airport city planned in the Helsinki area, Finland. This project includes construction of many buildings, one of which was using Scanclimber Wega H65 hoists. See how the Wega hoists delivered the results at this 30 meter high building