Discover how the Scanclimber SC5000 Mast Climbing Work Platforms (MCWP) helped deliver safe, efficient, and reliable access for stay cable installation during the construction of the Grenland Bridge in Norway.
You may also like
Scanclimber SC8000 Eurotower
The façade of the 148 meters (486 feet) tall Eurotower in Frankfurt is being clad with heavy panels by using Scanclimber SC8000 mast climbing work platforms. This 40-storey high-rise office building was formerly the headquarters of the European Central Bank (ECB). The SC8000 mast climber is ideal for heavy-duty façade work, and for projects requiring extra-large platform size. You can lift materials and workers to the desired working height safely and conveniently at the same time. A mast climbing work platform saves time and money at work sites.
Scanclimber SC1000
SC1000 mast climbing work platform - easy assembly and transportation by towable trailer chassis.
Scanclimber SC8000
Scanclimber SC8000 mast climbing work platform - a practical solution for heavy-duty works at minimal cost.
Scanclimber Multiplatform System
Scanclimber Multiplatform System, 44 x Scanclimber SC4000 Mast Climbing Work Platforms in total, used for the cladding work on the 275 meters high IB Tower building, Kuala Lumpur, Malaysia.
Customer view of wrapping Arc de Triomph using customized Scanclimber mast climbers
The project coordinator Mr. Sébastien Roger from the main contractor Charpentiers of Paris describes an adventure with Christo for the packaging of the Arc de Triomphe with help of Scanclimber mast climbing platforms.
Page 5 of 8




