A mid-speed Scanclimber Wega SC2537-65H construction hoist used at the worksite of Majakka to transport personnel, tools and material between the 35 floors.
You may also like
Scanclimber Double Decker
The Scanclimber Double Decker is the winner in the IAPA Awards 2014 in the category "Product of the Year -- Mast Climbing Work Platforms/Hoists". The Double Decker expansion transforms the standard mast climbing work platform to a dynamically aligning platform. That makes it easier and quicker to perform surface work on rounded, curved and arched surfaces.
Scanclimber Multiplatform System
Scanclimber Multiplatform System, 44 x Scanclimber SC4000 Mast Climbing Work Platforms in total, used for the cladding work on the 275 meters high IB Tower building, Kuala Lumpur, Malaysia.
Customer view of wrapping Arc de Triomph using customized Scanclimber by Tractel mast climbers
The project coordinator Mr. Sébastien Roger from the main contractor Charpentiers of Paris describes an adventure with Christo for the packaging of the Arc de Triomphe with help of Scanclimber by Tractel mast climbing platforms.
Scanclimber hoist used at an underground tunnel at CERN
Scanclimber Falcon hoist transports personnel and materials to and from the ground level on access shaft at CERN, Switzerland.
Jarno Säippä of Posiva’s shares insights about Onkalo nuclear disposal facility
Jarno Säippä is the project manager at Posiva's (www.posiva.fi) Final disposal - project. He has worked in the mining industry in various positions and is now responsible for the project’s shaft construction. In this video, Jarno shares Posiva's experience with working with Scanclimber's machinery on this magnanimous project.