Centum SC10000

The Centum SC10000 embodies the pinnacle of mast climbing work platform technology, setting a new standard for heavy-duty construction and facade work. With the strongest drive unit across the family of MCWPs, this powerhouse is designed to lift heavy loads to demanding heights with ease and precision, making it the ultimate choice for projects that push the boundaries of scale and complexity.

Product images are provided to enhance understanding and may differ from actual product appearances; please contact our team or refer to the instruction manuals for detailed information.

Key Features

Lifting Speed

8 m/min

Loading Capacity

Up to 6000 kg with single unit configurations
Up to 10 000 kg with a twin unit configurations

Installation Height

Up to 150 meters and higher

Platform Length

Up to 20.1 meters with single unit configurations
Up to 48.6 meters with a twin unit configurations

Max. Free Standing Height

Up to 19 meters

Technical Information

SC10000 Capacity
Capacity SC10000 Single SC10000 Twin
Max. platform length 20.1 m 48.6 m
Max. lifting capacity / platform length 6000 kg / 4.1 m 10200 kg / 15.8 m
  5600 kg / 7.3 m 10400 kg / 19 m
  5300 kg / 10.5 m 8800 kg / 24.6 m
  4000 kg / 13.7 m 6600 kg / 30.2 m
  3100 kg / 16.9 m 4300 kg / 40.6 m
  1800 kg / 20.1 m 1500 kg / 48.6 m

Maximum freestanding height

  • with extended outriggers on both sides
  • with extended outriggers on one side

*Depending on the platform length

  • 9 – 19 m*
  • 9–15 m*
  • 9 – 18 m*
  • 9–15 m*
Max. height with top anchor 25 m 25 m
Max. height with mast anchored 150 m (higher mast by request) 150 m (higher mast by request)
Max. anchor spacing 18 m 18 m
Vertical travel speed 8 m / min 8 m / min
Chassis drive unit speed 13 m / min  
Platform height at the lowest position 1.55 m 1.55 m
Max. allowed windspeed anchored 15.5 m/s 15.5 m/s
SC10000 Weights and dimensions
Weights and Dimensions SC10000 Single SC10000 Twin
Lowest transport height 2.4 m 2.4 m
Lowest platform level 1.55 m 1.55 m

Platform section

  • length
  • width
  • weight
  •  
  • 1.61 m
  • 1.6 m
  • 158 kg
  •  
  • 1.61 m
  • 1.6 m
  • 158 kg
Platform extensions
  • 0 – 1.8 m
  • 0 – 2.5 m
  • 2.6  – 6.0 m
  • 0 – 1.8 m
  • 0 – 2.5 m
  • 2.6  – 6.0 m

Mast section

  • length
  • width
  • height
  • weight

 

  • 0.7 m
  • 0.7 m
  • 1.25 m
  • 82 kg

 

  • 0.7 m
  • 0.7 m
  • 1.25 m
  • 82 kg

Lifting frame (fully equipped)

  • length
  • width
  • height
  • weight

 

  • 4.1 m
  • 1.6 m
  • 2.2 m
  • 2350 kg

 

  • 4.1 m
  • 1.6 m
  • 2.2 m
  • 2 x 2350 kg

Chassis with outriggers

  • length
  • width
  • weight

 

  • 5.1 m
  • 1.93 m
  • 1900 kg

 

  • 5.1 m
  • 1.93 m
  • 2 x 1900 kg
SC10000 Electrical Installation
Electrical data SC10000 Single SC10000 Twin
Lifting motors 2 X 7,5 kW 4 X 7,5 kW
Supply voltage 2×400 V / 50 Hz 4×400 V / 50 Hz
Power supply fuses 3 x 32 A 3 x 32 A + 3 x 32 A
Needed Power supply 60 kVA 60 kVA
Max Starting Current 165 A 165 A
Control Voltage 48 VAC 48 VAC
Socket for hand tools 2 x 230 V / 16 A 4 x 230 V / 16 A
Drive motor 400 V / 1.1 kW 2 x 400 V / 1.1 kW
SC10000 Safety Equipment
Safety equipment SC10000 Single SC10000 Twin
Mechanical safety brake Yes Yes
Manual lowering system Yes Yes
Safetyrailing (h=1.10 m) and kickboard on the platform Yes Yes
Functional limit switches at the top and bottom of the mast Yes Yes
Final limit switches on the top and bottom of the mast Yes Yes
Spring loaded disk brake torque 100 Nm Yes Yes
Inductive mast detector Yes Yes
Residual current device Yes Yes
Automatic platform level control system on twin mast version   Yes

Video

Play Video
Play Video

Scanclimber Mast Climbers bricklaying and the handling of workers and materials

koas_harju_jkl_platforms
Muuraus Nahkala, bricklaying using our strongest mast climber, the SC10000
The student housing organization KOAS, is building new student housing in the city of Jyväskylä, in central...
Read More
attendeo_care_home_cover
Muuraus Nahkala laying bricks at two floor care home with mast climbers in Hyvinkää
Care home developer Tyvene is building a sheltered housing complex in Hyvinkää. Although it is only a...
Read More
hus_hospital_complex
Mast climbers helped to build Hyvinkää's new hospital in Finland
HUS - The Hospital District of Helsinki and Uusimaa invested 63 million euros in a major Hyvinkää hospital...
Read More

Ready to Reach Higher

Get in touch

Search