Clarion Hotel Helsinki is a 16-storey building including two towers, the highest being at the height of 78 meters. Scanclimber contributed to this project with two SC5000 and one SC6000 mast climbing platforms and a SC1432 construction hoist. Mainly the mast climbing platforms were used for facade work of the hotel. Construction hoist SC1432 was deployed for quick and efficient transportation of material and labor inside the building.
You may also like
Discover how Scanclimber SC8000 Mast Climbing Work Platforms provided efficient façade installation at the landmark Aarhus Docklands (Aarhus Ø), Denmark, one of Scandinavia's largest waterfront redevelopment projects.
Discover how the Scanclimber SC5000 Mast Climbing Work Platforms (MCWP) helped deliver safe, efficient, and reliable access for stay cable installation during the construction of the Grenland Bridge in Norway.
Hear directly from the customer how the Scanclimber mast climbing work platforms helped improve productivity, site efficiency, and working conditions.
Hear directly from a bricklayer working on a residential facade construction project in Växjö, Sweden, as he shares his experience using the Scanclimber SC8000 mast climbing work platforms.
Scanclimber’s SC8000 boosted facade construction in Växjö with 30% savings, 2× productivity, and top‑tier safety, proving mast climbers are the smarter alternative to scaffolding.




