Clarion Hotel Helsinki is a 16-storey building including two towers, the highest being at the height of 78 meters. Scanclimber contributed to this project with two SC5000 and one SC6000 mast climbing platforms and a SC1432 construction hoist. Mainly the mast climbing platforms were used for facade work of the hotel. Construction hoist SC1432 was deployed for quick and efficient transportation of material and labor inside the building.
You may also like
Scanclimber’s SC8000 boosted facade construction in Växjö with 30% savings, 2× productivity, and top‑tier safety, proving mast climbers are the smarter alternative to scaffolding.
As a global leader in mast climbing work platforms, Scanclimber deliver versatile, powerful, and reliable solutions for the construction industry.
Twin SC8000 custom configured square mast climbing work platform used to transport personnel, tools, and materials for the chimney demolition of a Power Plant.
Scanclimber’s advanced Mast Climbing Work Platforms (MCWPs) provided the ideal solution for material transport and installation at heights of up to 110 meters.
Chimney demolition project of the Mülheim-Kärlich nuclear power plant.




