Find Out Case Stories

Scanclimber’s reference projects showcase real‑world applications of our transport platforms in demanding construction, renovation and industrial environments worldwide. Explore case stories from landmark façades, high‑rise developments, demolition projects and specialised engineering challenges.

Arhus-water-front-1

Scanclimber Mast Climbing Work Platforms for Façade Installation at Aarhus Docklands

A high-capacity Scanclimber mast climbing work platform capable of transporting heavy façade materials while providing safe, efficient access to challenging...
Open Case Story
Greenland_Bridge_087

Scanclimber Mast Climbing Work Platforms Support Stay Cable Installation on the Grenland Bridge Norway

Discover how the Scanclimber SC5000 Mast Climbing Work Platforms (MCWP) helped deliver safe, efficient, and reliable access for stay cable installation...
Open Case Story
Växjö-construction-project

Scanclimber Mast Climbing Work Platform for Facade Construction in Växjö, Sweden

A residential construction project in Växjö required a high-performance facade access solution to overcome common challenges in modern bricklaying and...
Open Case Story
y-tower amsterdam

Scanclimber’s Role in Elevating the Y-Tower

The Y-Tower now stands completed, with its natural stone façade serving as a testament to the synergy between architectural ambition and engineering innovation....
Open Case Story
mast climber chimney demolition

Scanclimber's Innovative MCWP Solution for the Chimney Demolition of a Power Plant

The demolition project in Berlin presented a unique and demanding challenge in its efforts to dismantle three 80-meter-high chimneys located atop a 100-meter-tall...
Open Case Story
L’Arc de Triomphe Wrapped

Wrapping of L'Arc de Triomphe

For the “L’Arc de Triomphe Wrapped” project, the Christo team and Les Charpentiers de Paris chose Scanclimber to design and supply a number of access platforms....
Open Case Story
The Onkalo nuclear waste disposal facility

Finnish nuclear waste, terminal placement in 500-meter- deep bedrock at Onkalo

The Onkalo nuclear waste disposal facility under construction in Olkiluoto, Finland, will be the world's first permanent geological repository for spent...
Open Case Story
Heidelberg Europaplaz

Zech installing windows at Heidelberg Europaplaz

Around Heidelberg Europlatz main building, Zech had twelve Scanclimber SC8000 mast climbers with glide rails helping in a demanding window and facade element...
Open Case Story
Funke Medienhäuser building

Triple Hoist helping building work at Funke Mediengruppe HQ in Germany

Funke Medienhäuser built a new headquarters and office buildings in the very center of Essen. Three Scanclimber Triple Hoists handled the vertical logistics...
Open Case Story
iapa winner

A throwback to Scanclimber’s history at the IAPAs

IPAF has awarded Scanclimber multiple times because of its industry-leading in rack and pinion-based vertical access solutions.
Open Case Story
The Roman Catholic Cathedral in Cologne

Cologne Cathedral – an eternal restoration project

The Roman Catholic Cathedral in Cologne is one of the most visited landmarks in Germany with an average of 20,000 visitors a day. This six-hundred-year-old...
Open Case Story
iapa-winner-logo-2-s

Scanclimber’s HD mast climber wins IAPA product of the year 2021

The International Powered Access Federation (IPAF) is a non-profit organization that promotes the safe and effective use of powered access equipment worldwide....
Open Case Story
longest mast climber ever

Tallest building in Bielefeld, Germany faced with longest mast climber ever

In 2017, Deutsche Telekom vacated a high-rise building in Bielefeld, Germany. Subsequently, the idea was to convert it into a residential student building....
Open Case Story
freestanding mast climber

Mast climbers used at the new post office headquarters at Luxembourg

Opposite the Luxembourg railway station, the ‘Centre Postal Gare’ construction work is progressing at full speed. The building of the new official headquarters...
Open Case Story
weather covers on construction

Total Cover System with Mast Climbers in Roskilde, Denmark

Weather covers are used in the construction industry to protect buildings against bad weather and to keep structures dry during the construction process....
Open Case Story
The Växjö Town Hall project with inclined walls

Skanska constructs the largest wooden building in its history

Växjö is the centre of the wood building industry in Sweden. The new town hall and railway station is mostly of wood and glass construction with inclined...
Open Case Story
mulheim karlich kernkraftwerk

Mülheim-Kärlich nuclear plant demolitionin in Germany

ABB Company constructed the Mülheim-Kärlich nuclear power plant from 1975 to 1986. The plant is located on the Rhine, close to Mülheim-Kärlich, Germany....
Open Case Story
bricklaying using mast climber

Muuraus Nahkala, bricklaying using our strongest mast climber, the SC10000

The student housing organization KOAS, is building new student housing in the city of Jyväskylä, in central Finland. It aims to provide 160 new apartments...
Open Case Story
renovation project at Blue Horizon

Noise cancellation innovations for a renovation project at Blue Horizon, Frankfurt

In the heart of Frankfurt 2.8 meter high noise cancellation panels were used with Scanclimber work platform on renovation project of old office buildi...
Open Case Story
clarion hotel construction site

Window and facade installation using MCWPs at the Clarion Hotel, Helsinki

The Clarion Hotel Helsinki is a 16-storey building including two towers, the highest being at the height of 78 meters. Scanclimber contributed to this...
Open Case Story
snake platform in India

Even severe space constraints can’t stop Scanclimber’s snake platform in India

A petrochemical plant in India needed a unique solution to renovate its 100-meter-high chimney because of lack of space at ground level. Scanclimber delivered...
Open Case Story
water tower lahti

Scanclimber MCWPs crafting new looks for water tower, Lahti, Finland

Lahti’s water tower, with its bright new-looking façade, stands tall and gives a spectacular view of the city from the top. The tower’s facade was in real...
Open Case Story
keimola briclaying project

Scanclimber races in bricklaying at Keimola development circuit

Once a renowned international racing circuit, Keimola is being converted into a residential area. Scanclimber MCWP’s ensure optimal ergonomics and high...
Open Case Story
op-pohjola vallila

OP-Pohjola building shines in Vallila

The OP Financial Group is Finland’s largest financial services group. This major OP-Pohjola project in Vallila consisted of renovating and building offices...
Open Case Story
radisson sas blue hotel

Radisson Blu: Scanclimber restoring highest Latvian hotel

Radisson Blu Hotel Latvia dates back to the early 1960s when the idea emerged to build a 10-storey hotel for a Russian travel agency. This agency was titled...
Open Case Story
pietarsaari water tower renevation

Renovation gives 90 more years to the Pietarsaari water tower

The historical brick water tower in Pietarsaari was taken out of use for several months at the end of May 2014. During the extensive renovation, the water...
Open Case Story
ib tower project

IB Tower, a unique landmark of Kuala Lumpur, is standing tall

The Petronas Twin Towers are not the only high rise buildings in the city of Kuala Lumpur. There are several other tall buildings in the city which exceed...
Open Case Story
lorrach hotel construction site

Hotel Stadt Lörrach stands tall, thanks to Scanclimber’s efficient solutions

Mast climbing work platforms, in tandem with monorail lifting equipment, provided an efficient solution for the demanding façade element installation work...
Open Case Story
Amager Bakke façade work

Skiing on waste-to-energy plant at Amager Bakke

Mast climbers played an important role in the Amager Bakke façade work. Amager Bakke is a state-of-the-art waste to energy plant, one of the best in the...
Open Case Story
mast climbers on grand tower

Mast Climbing Work Platforms used on Frankfurt’s tallest skyscraper

The Grand Tower in Frankfurt is the tallest residential building in Germany (2018). Scanclimber delivered 12 customised units of Monster SC8000, 2 units...
Open Case Story
hyvinkaa hospital project

Mast climbers helped to build Hyvinkää's new hospital in Finland

HUS - The Hospital District of Helsinki and Uusimaa invested 63 million euros in a major Hyvinkää hospital expansion project. 15 mast climbers helped to...
Open Case Story
brick laying with mast climbers

Muuraus Nahkala laying bricks at two floor care home with mast climbers in Hyvinkää

Care home developer Tyvene is building a sheltered housing complex in Hyvinkää. Although it is only a two-storey building with a maximum height of 12 metres,...
Open Case Story
ib tower kuala lmpur

Counter Balanced Extensions on a zig-zag facade at the worksite in Malaysia

A demanding mast climber solution was required on the 150-meter-tall zig-zag form buildings in Kuala Lumpur. Sliding decks of almost four meters made façade...
Open Case Story
monaco villa engelin speeding building project

A Mast Climber first - speeding up construction work in Monaco

Villa Engelin Monaco was a challenge for the constructor. It meant building a mixed-use complex in challenging circumstances within a very tight schedule...
Open Case Story
Katy Station façade work in Dallas

Katy Station façade work in Dallas

The facades of tallest Dallas residential building, the 30-story Katy Station, finished with the help of heavy-duty mast climbers in Texas, USA.
Open Case Story
extensive restoration project

Restoring One Thousand Ocean condominium in Florida

The luxury 10-storey One Thousand Ocean condominium is undergoing an extensive restoration project with the help of Scanclimber mast climbers in Boca Raton,...
Open Case Story
restoring brick facades

Restoring brick facades with at Dallas High School

Maxus SC5000 mast climbing work platforms were used on the Dallas High School historical building for façade restoration work. Building went through a...
Open Case Story
concrete restoration work

Quadomain condominium construction project in Florida

National Concrete Preservation Inc. conducted full concrete restoration work at Atlantic Ocean beach front in Hollywood, Florida with Scanclimber Maxus...
Open Case Story
construction work of the world’s tallest wind turbine tower

Max Bögl built the world’s tallest wind turbine tower at Gaildorf

Two L-shaped twin mast climbing work platforms were used to build the concrete water tank at the world’s tallest wind mill. A unique mast climber solution...
Open Case Story
water renovation

Water Tower renovation in Oulunsalo, Northern Finland

A special renovation task took place in Oulunsalo where the project was a water tower. The facade and roof of the water tank on the top of the tower had...
Open Case Story
Loading...

Interested in Scanclimber Products or Project Solutions?

If you want to learn more about Scanclimber mast climbers, transport platforms or the solutions shown in these project cases, our sales team is ready to help. We provide technical guidance, product recommendations and project‑specific support.

Search