The customer’s point of view on use Mast Climber in window installation and wall cladding.
You may also like
Twin Falcon hoists at Niittyhuippu 90 meters tall windy site
Scanclimber construction hoist family offers the right product for demanding applications. SRV the main contractor a construction project of the 26-storey apartment building in Niittykumpu, Finland used a Twin Falcon SC1432 hoists to material and person transportation. Read more about the site in Finnish.
MCWP’s with monorail lifting equipment at facade work in Germany
Mast climbing work platforms together with monorail lifting equipment provided efficient solution for demanding facade element installation work at Hotel Stadt Lörrach in Germany.
Facade installation using MCWP:s at Clarion Hotel Helsinki
Clarion Hotel Helsinki is a 16-storey building including two towers, the highest being at the height of 78 meters. Scanclimber contributed to this project with two SC5000 and one SC6000 mast climbing platforms and a SC1432 construction hoist. Mainly the mast climbing platforms were used for facade work of the hotel. Construction hoist SC1432 was deployed for quick and efficient transportation of material and labor inside the building.
SC6000 twin mast climbers with sliding deck extensions at Amager Bakke
Scanclimber SC6000 twin work platforms with sliding deck extensions are used as access equipment for assembling facade of Amager Bakke, the world’s most modern and environmentally friendly waste-to-energy plant.
Scanclimber All Reach Extension (ARE)
Scanclimber’s All Reach Extension (ARE) provides access from Mast Climbing Work Platforms (MCWP) into complex structures. ARE is an out-reaching mast climber extension that can move along the platform, glide in and out from the main platform and can slew 90 degrees.
Page 3 of 8




