Welcome Scanclimber part of Alimak Group

Call us

+358 10 680 7000

Monday to Friday

9:00am - 6:00pm

E-mail us

Category: References

Applications

Scanclimber’s Role in Elevating the Y-Tower

The Y-Tower now stands completed, with its natural stone façade serving as a testament to the synergy between architectural ambition and engineering innovation. Scanclimber’s MCWPs not only enabled the successful execution of this challenging project but also demonstrated the brand’s commitment to providing solutions that enhance efficiency, safety, and precision.

Read More »
Applications

Scanclimber’s Innovative MCWP Solution for the Chimney Demolition of a Power Plant

The demolition project in Berlin presented a unique and demanding challenge in its efforts to dismantle three 80-meter-high chimneys located atop a 100-meter-tall structure. Traditional methods of deconstruction proved impractical due to the absence of cranes and the complexities of transporting workers and equipment to such heights. Scanclimber’s Mast Climbing Work Platforms (MCWPs) delivered an effective and innovative solution to overcome these obstacles.

Read More »

Mast Climbers Cases

Mast Climber Cases Read Our Mast Climber Case Stories Scanclimber’s reference projects showcase real‑world applications of our mast climbers in demanding construction, renovation and industrial

Read More »

Transport Platforms Cases

Transport Platforms Cases Read Our Transport Platforms Case Stories Scanclimber’s reference projects showcase real‑world applications of our transport platforms in demanding construction, renovation and industrial

Read More »
References

References

Project Cases Demonstrating Scanclimber Solutions in Construction and Industry Discover how Scanclimber equipment is used in bricklaying, façade work, high‑rise construction, industrial sites, renovation and

Read More »
Applications

Wrapping of L’Arc de Triomphe

For the “L’Arc de Triomphe Wrapped” project, the Christo team and Les Charpentiers de Paris chose Scanclimber to design and supply a number of access platforms. These were specially adapted for the installation of the structures that support the covering fabric under the vault of the Arc de Triomphe.

Read More »
The Onkalo nuclear waste disposal facility
Applications

Finnish nuclear waste, terminal placement in 500-meter- deep bedrock at Onkalo

The Onkalo nuclear waste disposal facility under construction in Olkiluoto, Finland, will be the world’s first permanent geological repository for spent nuclear fuel and high-level radioactive waste. Posiva is using a Scanclimber hybrid hoist-work platform SC2000 in assembly work inside the personnel shaft in Onkalo. The product was custom-built according to Posiva’s requirements. The SC2000 hoist-work platform is a hybrid of a hoist and a mast climber (MCWP).

Read More »

Get in Touch

You will find yourself working in a true partnership that results in an incredible experience, and an end product that is the best.

Call us on

+358 10 680 7000

Email Us

Get in Touch

Scanclimber Oy

Direct Number